The design process of the new office, which will occur in the renovation of existing buildings in the old industrial fabric factory in Istanbul; applications with ease, axiological, resulted in the realization of the objectives of sustainable and useful.

+

Design and implementation had to be completed in the same time and in a very short time of 30 days. All elements that are active on the architectonics the building was laid on the table at the same time with the design process. offices will be reconstituted into a shell side of a factory production plant renovation and will pass through the other side. Line with a common language and structure in order to create fiction in the selection of detail and material compliance with the requirements of contrasts between the old and the new were the most important criteria.

The process of architectural applications with the best result in order to complete the mechanical and electrical infrastructure were carried out from one source. from outside to inside with a shell consisting of factories in the application program it was created as a cocoon. The outer shell is established, then the ones created by the leveling of the floor and the ceiling, detailed architectural applications from one side. Graphics and paint applications after the completion of the project with the installation of the application is completely transparent interior glass separation was completed at a time.

+
+
+
+
+
+
+
+
+
+
+
+
+
+
Client
Eren Elektrik A.Ş.
Location
Pendik, Istanbul
Type
Factory + Offices
Construction Area
1.500 m²
Project Area
1.500 m²
Project Date
2013
Status
Complate
Architect
Serkan Atilla Cedetas
Team
Ozan Can Er, Ezgi Üçüncü
Electricity
MC Elektrik
Engineering
Açıkalın Yapı
Lighting
Silikon Aydınlatma
Graphic
Ülker
Photography
Ali Bekman
×